I had about 150 projects to do this weekend and got a good many of them done. I have one room in the basement that I’ve now wired for cable, network, and phone. I also redid the insulation and plastic vapor barrier for the room. All I have left is to build a TV cabinet into the wall in this room and it’s ready to sheetrock. Almost one room down, three to go.
Professional tip: Don’t go for a run before you put in insulation. Sweat and the pink stuff seem to like each other a lot. Damn that stuff is itchy.